|
GEOTECHNOLOGY: UNDERGROUND, OPEN, CONSTRUCTIONAL
|
|
|
Lamamra A. Neguritsa D. L. |
Elimination of diatomite dust in the longwall extraction section in the Sig mine western Algeria (In English) |
|
|
Kuriachii A. E. Kaliagin S. M. |
Applying modern technologies when drilling directional wells with long horizontal boreholes (In English) |
|
|
|
GEOMECHANICS. DESTRUCTION OF ROCKS
|
|
|
Lipin Ia. I. Sentiabov S. V. Krinitsyn R. V. |
Investigating the variation of the fields of elastic stresses in the rock mass when developing the Peschanskoye deposit |
|
|
Koptiakov D. A. Kharisov T. F |
Investigation of dependences of physical and mechanical properties of serpentinites of the Dzhetygarinsky deposit |
|
|
Filatov V. V. Bolotnova L. A. |
Upper Kama potassium salt deposit tectonic scheme based on physical modeling results and geological and geophysical data |
|
|
|
MINING AND OIL-AND-GAS GEOLOGY, GEOPHYSICS
|
|
|
Karablin M. M. Prostov S. M. |
Slope stability analysis of man-made soil body surrounding the abandoned hydraulic dump |
|
|
|
MINERAL PROCESSING
|
|
|
Barmin I. S. Morozov V. V. Polivanskaia V. V. |
Improving the technology of mature tailings processing at the Kovdorsky GOK |
|
|
|
ECONOMICS AND MINING PRODUCTION CONTROL
|
|
|
Loginov V. G. Ignatieva M. N. Iurak V. V. Drozdova I. V. |
Drive-in drive-out method of employing people for Arctic oil and gas resources exploration |
|
|
|
GEOECOLOGY, RATIONAL NATURE MANAGEMENT
|
|
|
Amosov P. V. Baklanov A. A. Makarov D. V. Masloboev V. A. |
Estimating air pollution levels by numerical simulation depending on wind flow speed and dust source area (In English) |
|
|
Ерохин Ю. В. Захаров А. В. Леонова Л. В. |
Slags of chromium cast iron production from Alapaevsky plant (composition and geoecology) |
|
|
|
MINING MECHANICAL ENGINEERING. MINING MACHINERY AND TRANSPORT
|
|
|
Kochneva L. V. Tauger V. M. Volkov E. B. |
Study of physical and mechanical properties of working blades material effect of the noise from the mine axial fan |
|
|
Гутаревич В. О. Игнаткина Е. Л. |
Study of the braking regime of rolling stock mining suspended monorail taking into account clearances in the coupling |
|
|
|
ELECTRIFICATION AND AUTOMATION OF MINING ENTERPRISES
|
|
|
Kuzmin R. S. Kuzmin I. S. Menshikov V. A. Kuzmin S. V. Kulikovskii V. S.. |
Method of assessment and prediction of overvoltage caused by single-phase arc ground short circuits in the 6–10 kV mains, as a way of increasing the electrical safety level in mining facilitie |
|
|